Unexpected issues may arise (i.e. extra plumbing or electrical work, old sheetrock, etc.) which may take some time to resolve. By working with us to prepare for your new kitchen, you can expect those little details to be all worked out before the installation even begins. Giving you a peace of mind and a smooth transition in to your new design.

Preparing Before Installation

New kitchen cabinets may take anywhere between 4-12 weeks to manufacture. So in order to be prepared here is a quick list of things to think about prior to receiving the cabinets.

  1. To receive the delivery of your new cabinets, you will need to determine where the cabinets can be stored in your home prior to installation.
  2. You will need to empty all existing cabinets before they are removed and move any tables or other obstacles that may be around the area where the new cabinets will be installed.
  3. An average kitchen installation takes about a week. You will not have access to your sink, stove/oven, or other appliances during this time. Make sure to think of alternatives for when you need to use those things.

Other things to know about installations
Your new kitchen may be functional within the first week. Countertop lead-time and installation varies depending on the countertop material you chose. Example: A laminated countertop will be ready in 5 to 7 working days.

Also, when getting a solid surface countertop, such as Corian or Cambria, templating is scheduled when the base cabinets are installed. It will take about 10-14 days to fabricate and then another day or two for installation.